Installation of SW and FW drainage throughout Phases A & B. Due to levels on site the majority of the FW system & lateral manholes was above 5mtrs deep. This SW scope includes 3x large PCC attenuation tanks. Extensive 278 works to Ankerbold Road inclusive of the construction of a new footpath and Highway drainage system along with road crossing to get the new drainage system to the outfall locations.