Installation of new effluent drainage system.
This included Pumping Station and
Klargester tank externally. Logistical &
engineering challenges due to these being
installed at the side of the newly
constructed unit. A large section of floor
slab had to be removed in sections in
order to accommodate the drainage
system which picked up liquids from
the wash down facility