Large mezzanine floor and the ability to install an automated picking system which consists of a large framework for the racking. In order to achieve this we had to cut and remove 200 sections of the concrete floor slab to allow concrete piles to be installed. Once installed we had to tie in a steel cage to each foundation and reinstate the slab.